MEDICAL COLLEGE
BUILDING
|
12722.00 Sqm
|
89.05 Lacs
|
A five story medical college building was built in
1962. This houses, Anatomy Department, Mortuary,
Physiology, Pathology, Pharmacology,
Pharmacy and Community Medicine departments.
An animal house is also a part of the medical college
complex.
|
ADMINSTRATIVE
BLOCK of PGIMS
|
2252.00 Sqm
|
22.07 Lacs
|
A double story Administrative Block houses
Administrative Offices of the Director and Library
and Examination cum
Reading Hall.
|
REGIONAL CANCER
CENTRE
|
3489.24 sqm
|
101.40 Lacs
|
Complete and houses Department of Radiotherapy,
Radiation Oncology, Surgical Oncology and the
Department Of Biotechnology & Molecular medicine.
|
REGIONAL
INSTITUTE OF OPHTHALMOLOGY
|
12270.64 sqm
Include 91
(indoor beds)
|
1528.00 Lacs
|
Construction to start soon (DNIT under preparation
for calling Tenders).
|
SUPER SPECIALTY BLOCK
|
A= 3275.10 sqm
B+C=7988.53 sqm
D+E=1869.50 sqm
|
132.75 Lacs
720.21 Lacs
95.92 Lacs
|
University hospital has a full fledged and well
equipped superspecialy block which houses
Cardio-thoracic (CTVS), Cardiology, Urology,
Nephrology and Neurosurgery Departments.
The super specialty block has undergone extension.
Two more blocks named B, C,D,E. Construction of
Block C is complete whereas 40% work of Block B
is complete. Work is likely to be completed
by 31.12. 2009.
|
DENTAL COLLEGE
|
4620.0 sqm
|
538.90 lacs
(extension)
|
University has a full fledged and well equipped
Dental College. Which houses Departments of
Peritonitis, Orthodontics, Oral Medicine,
Prosthodontics, Oral Surgery, Pedodontics,
and operative dentistry. College
runs BDS, MDS and Diploma in Dental Mechanic
and Dental Hygeine. Dental College is undergoing
extension. Work is likely to be completed by 18.02.2011.
|
BASIC SCIENCES
BLOCK
|
6916 sqm
|
88.33 lacs
|
University has a well equipped and well furnished
Basic Sciences Block which houses Departments
of Microbiology & Biochemistry and College of
Nursing.
|
COLLEGE OF
NURSING
|
4672.84 sqm
|
274.23 lacs
|
Structure completed plastering complete flooring in progress overall 90% work is completed. The college
is likely to be fictional in July/August 2009.
|
TRAUMA CENTRE
|
19587.60 sqm
|
2588.00 lacs
|
Work re-allotted approximately 10% work completed
likely to a ready by 18/02/2011
|
MOTHER & CHILD
HOSPITAL
|
14000 sqm
|
1148.00 lacs
|
Work re-allotted lay out of work in progress likely to
be completed by 18/02/2011
|
MENTAL HOSPITAL
|
5000 sqm
|
698 lacs
|
Structure completed plastering and flooring, 95%
complete further working in progress likely to be completed by 31/07/2009
|
HOSPITAL (OPD) BLOCK INCLUDING A&E, PSYCHITRY, DEADDICTION CENTRE
|
24901.70 sqm
|
2435.00 lacs
|
Work re-allotted about 30% work complete building
likely to be completed by Aug. 2010.
|
AUDITORIUM
|
6083.05 sqm
|
1241.00 lacs
|
A 1250 capacity fully air-conditioned auditorium.
Structure 90% complete building to be ready by
December 2009
|
LECTURE THEATRE
|
1535.04 sqm
|
226.67 lacs
|
50% work is completed building likely to be ready
by December 2009
|
CENTRAL WORK
SHOP
|
2405.00 sqm
|
17.80 lacs
|
This Houses Machine Shops, Transportation
Department, Carpenter and Painting shops
|
SHOPPING COMPLEX
|
1728.83 sqm
|
8.47 lacs
|
This Houses Medical Stores, State Bank, Post Office,
and confectionary shops
|
CENTRAL STORE
|
1246.27 sqm
|
13.38 lacs
|
This houses store for hospital and scientific and miscellaneous supplies.
|
POWER HOUSE
|
162.8 sqm
|
7.70 lacs
|
This houses Electric station, transformers etc.
|
RESIDENTIAL HOUSES
|
50755.28 sqm
|
685.63 lacs
|
This includes residential accommodation for
faculties.
|
VISHRAM SADAN
|
2383.74 sqm
|
44.33 lacs
|
This is a facility made for accommodation of
Attendants of the Patients admitted in the hospital
and is located close to the Super specialty Block
|